For more than 20 years, ACCIONA has been building data centres for clients worldwide — facilities designed to the highest security standards to guarantee autonomous, uninterrupted operation of their information technology and operations systems.
In Australia, we bring that global experience together with something equally important: the ability to deliver the power, water and civil infrastructure that data centres depend on.
Demand for digital infrastructure in Australia is accelerating sharply, driven by AI workloads and cloud expansion. But the constraint is no longer land or capital — it is the infrastructure underneath. Grid connection in Sydney and Melbourne can take two to three years.
Transmission capacity, firmed renewable supply, water for cooling and complex ground conditions now determine whether a project proceeds and when.
These are the problems ACCIONA solves. We develop, build, own and operate renewable generation, battery storage and transmission infrastructure; we design, build and operate water treatment and reuse facilities; and we self-perform the civil and structural construction that sits beneath it all.
ACCIONA Energía is the largest 100% clean energy company in the world, and has been developing renewable energy in Australia since 2002.
- Generation — the MacIntyre Wind Precinct in Queensland, at 923 MW one of the largest onshore wind farms in the world, and the Aldoga Solar Farm.
- Storage — the Karara Battery Energy Storage System, 400 MW with 800 MWh of capacity, firming renewable supply through peak demand.
- Transmission — the Central West Orana Renewable Energy Zone in NSW and HumeLink East, unlocking the network capacity that new large-load connections depend on.