Construction of a bridge using composite materials by ACCIONA Construction's Technology Centre for access to the microhydroelectric plant of Iboundji, Gabon.

This is the first bridge built with composite materials in Gabon. It is 17 metres long and 6 metres wide, consisting of two continuous channel beams made from carbon fibre.

GENERAL INFORMATION

  • Location: Iboundji, Gabon.
  • Contract type: Construction.
  • Infrastructure: Composites bridge measuring 17 metres long and 6 metres wide, consisting of 2 continuous channel beams made from carbon fibre.
  • Year of project completion: 2014