    Gouda Wind Farm

    130 MW wind farm with 46 AW100/3000 wind turbines.

    Gouda is the first wind farm installed by ACCIONA in South Africa. Connected to the grid in 2015, it is equipped with 46 3-MW ACCIONA Windpower wind turbines mounted on concrete towers, with a hub height of 100 metres. Located in Drakenstein, approximately 100 km northeast of Cape Town, it can produce clean energy to cover the consumption of some 200,000 South African homes.

    GENERAL INFORMATION

    Location
    Drakenstein, Western Cape, South Africa
    Power
    138 MW
    Wind Turbine
    ACCIONA Windpower AW100/3000
    Tower
    Concrete, hub height: 100 m
    Commissioning
    2015
    Ownership
    ACCIONA (51%); Aveng (29%); Others (20%)

    Highlights

    • First ACCIONA wind farm in South Africa.
    • Estimated annual production of 423 GWh
    • Clean energy equivalent to the consumption of 200,000 homes.
    • 404 million tonnes of CO2 emissions prevented every year by coal-fired power plants.
    • Concrete tower with segments cast next to the site.
    • Average of 400 jobs (with peaks of up to 800) created during the construction phase.

    Image Gallery

    discover other flagship projects

    Mortlake South Wind Farm

    Mortlake, South Western Victoria (Australia)

    The Mortlake South Wind Farm is located 5 kilometres south of Mortlake in the Moyne Shire in South West Victoria. It is currently under construction, and once complete will consist of 35 wind turbine generators, with a maximum capacity of 157.5 MW, which is enough to power approximately 117,000 homes annually.

    MacIntyre Wind Farm

    Warwick, QLD

    Located approximately 50 km South-West of Warwick and approximately 10 kms south of Karara, the proposed MacIntyre Wind Farm is expected to have an export capacity of approximately 1,026 MW and up to 180 turbines.

    Move up

    YOU'RE JUST ONE STEP AWAY!

    Please, confirm your subscription on the email we have sent you and your registration will be completed.

    YOU'VE ONLY GOT ONE STEP LEFT!

    Please confirm your subscription in the email we just sent you to complete the registration and you will be able to download your ebook.

    YOU ARE ALREADY SUBSCRIBED TO THE NEWSLETTER!

    If you've missed our content, try checking your junk mailbox and
    add us to your address book so you can enjoy them without any problem.

    An error has occurred.

    Your email has been unsubscribed. You will not receive more newsletters, unless you subscribe again. Thank you very much