This website uses proprietary and third-party cookies. By continuing to navigate this website, you are accepting the use that we make of them. If you wish, you may change your settings on your browser.

What are you searching?

    Wroclaw Bridge

     

    The project involved the construction of a 612 metre cable-stayed bridge over the main channel of the river, with an addition of two overpasses, measuring approximately 611 metres and 521 metres on each side of the river, making a total length of 1.75 kilometres. 

    The central pier, located on Rędzińska Island in the middle of the river, is 122 m tall, the highest structure of its kind in Poland. The bridge was the first in Poland to be fitted with sensors to detect damage or deterioration in any of its components. 

    General Information

    Location
    Poland
    Contract type
    Construction
    Infrastructure
    A8 bypass highway part II
    Year of project completion
    2011

    Image Gallery

    discover other flagship projects

    Macksville Hospital Development (MHD) Early Works – Access Road and Bulk Earthworks

    ACCIONA Ferrovial Joint Venture (PACIFICO) has been engaged by Health Infrastructure for bulk earthworks and to design and construct an access road to the new hospital at North Macksville.

    Bridge over Clarence River at Harwood

    Harwood, NSW (Australia)

    ACCIONA Infrastructure as part of Acciona Ferrovial Joint Venture (AFJV), has been engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.

    Move up