Toowoomba Second Range Crossing

ACCIONA Infrastructure as a Design and Construct JV partner of the Nexus Infrastructure consortium, awarded with the contract to design and construct the $1.6 billion Toowoomba Second Range Crossing (TSRC).

In August 2015, Nexus Infrastructure was awarded the contract to design, construct, operate and maintain the 41km-long TSRC, connecting the Warrego Highway at Helidon Spa in the east with the Gore Highway at Athol in the west, via Charlton. The project is due for completion by end of 2018.

General information

Location
Toowoomba, QLD,Australia
Contract
PPP
Infrastructure
Design, construct, operate and maintain the 41km-long TSRC, connecting the Warrego Highway at Helidon Spa in the east with the Gore Highway at Athol in the west, via Charlton
Project Value
AU$ 1.6 billion
Estimated completion date
2018
Operation and Maintenance
25 years

Key Features

Key features of Design and Construct solution for the TSRC include:

  • Four lanes from Warrego Highway east interchange to Warrego Highway west
  • Grade separated interchanges at Warrego Highway west, Toowoomba-Cecil Plains Road interchange and Gore Highway
  • A grade separated connection to Mort Street
  • An approximately 30m deep cutting at the top of the Toowoomba Range will be constructed as an alternative to the tunnel solution detailed in the reference design to allow all heavy vehicles, including dangerous goods carriers and over-dimensional vehicles, to use the TSRC
  • An 800m long viaduct built over the existing Queensland Rail line
  • Continuity of the New England Highway through a new bridge over the cutting

Benefits

ACCIONA and our partners recognise the significance of this Toowoomba Second Range Crossing in terms of regional economic development, employment and supply chain opportunities and training and skills development. Benefits to the region include:

  • Creation of up to 1800 full-time jobs during the construction and maintenance of the project
  • Increase economic activity in the region by $2.4 billion over 30 years
  • Diversion of almost 80% of heavy and super-heavy commercial vehicles away from the existing range crossing
  • Diversion of heavy and super-heavy commercial vehicles away from the Toowoomba Central Business district
  • The avoidance of up to 18 sets of traffic lights
  • Reduction of travel time across the range by up to 40 minutes for heavy commercial vehicles
  • Increased freight efficiencies
  • Improved road and driver safety
  • Enhanced liveability for the Toowoomba and Lockyer Valley areas

Current Status

Click here for an update of construction on this project.

Image Gallery

discover other flagship projects

Macksville Hospital Development (MHD) Early Works – Access Road and Bulk Earthworks

ACCIONA Ferrovial Joint Venture (PACIFICO) has been engaged by Health Infrastructure for bulk earthworks and to design and construct an access road to the new hospital at North Macksville.

Bridge over Clarence River at Harwood

Harwood, NSW (Australia)

ACCIONA Infrastructure as part of Acciona Ferrovial Joint Venture (AFJV), has been engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.

Move up