    Toluca Airport Boulevard Intersection

    The intersection eases traffic flow between Airport Boulevard and the Toluca-Naucalpan Federal Highway, a key area in the Toluca's metropolitan area.

    Works on the first phase started in April 2014, and it was turned over in December of the same year. The project, with a length of 3,500 metres, facilitates traffic flow in the area with a view to reducing travel time and costs.

    The project included construction of dirt roads, drainage works, foundations and structures (vehicle bridge, mechanically stabilized walls), asphalt course, horizontal and vertical signage, as well as other ancillary works.

    General Information

    Location
    Toluca, State of Mexico (Mexico)
    Contract type
    Construction
    Infrastructure
    58 supports, 357 foundation piles, 45 foundation footings, 196 columns, 68 caps and 443 prefabricated beams; the accesses and declines of the axes will be constructed by means of mechanically stabilized walls
    Year of project completion
    2014

    Image Gallery

    discover other flagship projects

    Macksville Hospital Development (MHD) Early Works – Access Road and Bulk Earthworks

    ACCIONA Ferrovial Joint Venture (PACIFICO) has been engaged by Health Infrastructure for bulk earthworks and to design and construct an access road to the new hospital at North Macksville.

    Bridge over Clarence River at Harwood

    Harwood, NSW (Australia)

    ACCIONA Infrastructure as part of Acciona Ferrovial Joint Venture (AFJV), has been engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.

    Move up