    The Northern Road Upgrade - Stage 3

    This 3.8km component involves widening its two undivided lanes to a four-lane divided road, including a kerbside bus lane in each direction. It generally follows the existing road alignment and includes the reconstruction of the crucial M4 Motorway Interchange with The Northern Road. There will be continuous bus lanes in each direction, as well as a new shared pedestrian and cyclist path and footpaths.

    As the principal north-south route between Campbelltown and Windsor, The Northern Road is a key link with the M4 Motorway and the future M12 Motorway. Its multi-stage upgrade is part of the government’s $3.6 billion Western Sydney Infrastructure Plan to improve access to this rapidly growing region before the new Western Sydney Airport at Badgerys Creek opens in the mid-20s.

    This 3.8km component involves widening its two undivided lanes to a four-lane divided road, including a kerbside bus lane in each direction. It generally follows the existing road alignment and includes the reconstruction of the crucial M4 Motorway Interchange with The Northern Road. There will be continuous bus lanes in each direction, as well as a new shared pedestrian and cyclist path and footpaths.

    A set of lights at the M4 interchange will be removed, the overpass widened in a new bridge and the westbound off-ramps will allow for the separation of northbound and southbound traffic. Widening of the road involves a significant amount of services relocations and property adjustments. Sydney Water, Endeavour Energy, Telstra, Jemena, Optus, NBN Company and Pipe Networks are the major providers having assets that will require relocation. The road pavement is being fully reconstructed across the entire length of the project. Our scope also encompasses street lighting, drainage, safety barriers, landscaping, retaining walls and noise barriers.

    Our team successfully achieved a significant milestone with the demolition of the 50-year old bridge over the M4 Interchange. Demolition was fully completed within a 72-hour full shutdown of the motorway over the June 2019 long weekend. Importantly, this was the first time that Roads and Maritime Services (RMS) and the NSW Transport Management Centre (TMC) had allowed a major arterial motorway to be continuously shut down for this length of time.

    General information

    Location: The Northern Road - from Glenmore Parkway, Glenmore Park to Jamison Road, South Penrith, Western Sydney, NSW

    Contract Type: Design & Construct

    Completion date: 2020

    Project Value: $200 Million

    key Features

    • Widening a 3.8km section of The Northern Road providing a divided road with three general traffic lanes and a kerbside bus lane in each direction including 120,000m3 of earthworks
    • Upgrading the interchange with the M4 Western Motorway including: Replacing the existing bridge over the M4 Motorway, realigning and widening the motorway entry and exit ramps and replacing the two sets of existing traffic lights with one set of traffic lights
    • Replacing the roundabout at Glenmore Parkway / Wentworth Road with a four-way intersection and a set of traffic lights
    • Realigning sections of Aspen Street and Hilliger Road to allow for a four-way roundabout at Maxwell Street. This roundabout would include a traffic light on Aspen Street only, to control the flow of traffic into Maxwell Street
    • Installation and relocation of 44km of utility services including electrical, telecommunication, gas, potable water and sewer conduits
    • Successful collaboration between TfNSW, TMC, NSW EPA and ACCIONA for the successful 72-hour shutdown of the M4 Motorway, demolishing the existing Northern Road bridge

    Benefits

    The Project is a component of the Australian and NSW Governments’ Western Sydney Infrastructure Plan. This upgrade of the Northern Road, Glenmore Parkway to Jamison Road will:

    • Improve congestion
    • Support future public transport
    • Improve road user safety

    Environmental information

    Environmental Protection Licence 20910

    Environmental Protection Licence 21095

    Location of Monitoring Points 20910

    Location of Monitoring Points 21095

    Premises Maps 21095

    Pollution Incident Response Management Summary 20910

    Pollution Incident Response Management Summary 21095

    Out of Hours Protocol 20910

    Environmental Protection Licence Monitoring Data:

    Image Gallery

    discover other flagship projects

    Toowoomba Second Range Crossing

    Toowoomba, QLD (Australia)

    ACCIONA, as a Design and Construct JV partner of the Nexus Infrastructure consortium, ACCIONA was awarded the contract to design and construct the $1.6 billion Toowoomba Second Range Crossing (TSRC). 

    Bridge over Clarence River at Harwood

    Harwood, NSW (Australia)

    ACCIONA as part of Acciona Ferrovial Joint Venture (AFJV), was engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.

    Move up

    YOU'RE JUST ONE STEP AWAY!

    Please, confirm your subscription on the email we have sent you and your registration will be completed.

    YOU'VE ONLY GOT ONE STEP LEFT!

    Please confirm your subscription in the email we just sent you to complete the registration and you will be able to download your ebook.

    YOU ARE ALREADY SUBSCRIBED TO THE NEWSLETTER!

    If you've missed our content, try checking your junk mailbox and
    add us to your address book so you can enjoy them without any problem.

    An error has occurred.

    Your email has been unsubscribed. You will not receive more newsletters, unless you subscribe again. Thank you very much