    The Northern Road & Bringelly Road Upgrade - Stage 2

    Stage 2 Upgrade of The Northern Road and Bringelly Road involves both major roads being widened from generally two traffic lanes to become four-lane roads together with kerbside bus lanes, plus a wide central median to allow for future widening to six main traffic lanes. There will also be a 3m-wide shared pedestrian/cyclist path, new slip lanes and upgrades of intersecting streets.

    Our scope includes property adjustments and extensive relocations of gas, electricity, water, telecommunications and other utilities. A significant additional contract was awarded to the Lendlease team by Sydney Water to install a new Trunk Main.

    A key section of the Western Sydney Infrastructure Plan, this contract comprises three components that are being delivered as a single project to reduce the impact on local residents and traffic:

    1. The Northern Road Upgrade - Stage 2: An 11.3km upgrade of The Northern Road, between Peter Brock Drive at Oran Park and Mersey Road at Bringelly
    2. Bringelly Road Upgrade - Stage 2: Upgrading 4.3km of Bringelly Road, between King Street and The Northern Road
    3. Grade-separated Interchange: Replacing the intersection of The Northern Road and Bringelly Road with an underpass for The Northern Road, allowing traffic flow along both major roads without the need to stop at traffic lights.

    Both of these major roads are being widened from generally two traffic lanes to become four-lane roads together with kerbside bus lanes, plus a wide central median to allow for future widening to six main traffic lanes. There will also be a 3m-wide shared pedestrian/cyclist path, new slip lanes and upgrades of intersecting streets.

    Bringelly Road remains on its existing alignment, while a re-aligned section of The Northern Road is being diverted from its current route. To create the new underpass, our team placed 2,600m3 of concrete in a single continuous pour to construct one of the largest voided-slab, post-tensioned bridges ever built in Australia. At 57m wide, it is wider than the 45m-wide Sydney Harbour Bridge.

    The existing South Creek bridge will be demolished and replaced by two new 38m-long bridges over South Creek. Other aspects include indented bus bays on both sides of Bringelly Road, plus construction of a new car park and service road for Rossmore Public School.

    Our scope includes property adjustments and extensive relocations of gas, electricity, water, telecommunications and other utilities. A significant additional contract was awarded to theteam to divert the Sydney Water Main servicing this growing area.

    General information

    Location: The Northern Road, Oran Park & Bringelly Road, Bringelly, Western Sydney, NSW

    Contract Type: Construct only

    Completion date: 2020

    Project Value: $450 Million

    key Features

    • Total Length: 15.6km
    • 99,214 m3 of lean mix concrete
    • 2,590m3 of concrete placed in a single continuous pour to construct one of the largest voided slabs
    • ~$14 million on Indigenous spend

    Benefits

    • Increased capacity to cater for future population growth in the area
    • Improved safety for motorists by: building new intersections with traffic lights to access precincts, building a central median to separate opposing traffic flows, building turning lanes at intersections
    • Improved safety for cyclists and pedestrians through an off-road shared path
    • Improved travel times and capacity to accommodate future development needs
    • Access to future South West Priority Growth Area along The Northern Road
    • Improved access and travel times for road freight in Sydney’s south west.

    Environmental information

    Environmental Protection Licence 20864

    Location of Monitoring Points 20864

    Pollution Incident Response Management Summary 20864

    Environmental Protection Licence Monitoring Data:

     

     

    Image Gallery

    discover other flagship projects

    Toowoomba Second Range Crossing

    Toowoomba, QLD (Australia)

    ACCIONA, as a Design and Construct JV partner of the Nexus Infrastructure consortium, ACCIONA was awarded the contract to design and construct the $1.6 billion Toowoomba Second Range Crossing (TSRC). 

    Bridge over Clarence River at Harwood

    Harwood, NSW (Australia)

    ACCIONA as part of Acciona Ferrovial Joint Venture (AFJV), was engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.

    Move up

    YOU'RE JUST ONE STEP AWAY!

    Please, confirm your subscription on the email we have sent you and your registration will be completed.

    YOU'VE ONLY GOT ONE STEP LEFT!

    Please confirm your subscription in the email we just sent you to complete the registration and you will be able to download your ebook.

    YOU ARE ALREADY SUBSCRIBED TO THE NEWSLETTER!

    If you've missed our content, try checking your junk mailbox and
    add us to your address book so you can enjoy them without any problem.

    An error has occurred.

    Your email has been unsubscribed. You will not receive more newsletters, unless you subscribe again. Thank you very much