    The viaducts are 585 metres long, with spans of 140 metres and piers up to 90 metres tall. The structure was completed in 2009.

    General Information

    Location
    Granada, Spain
    Contract type
    Construction
    Infrastructure
    585 metres long, 140-metre spans and piers up to 90 metres tall
    Year of completion
    2008

    Image Gallery

    discover other flagship projects

    Macksville Hospital Development (MHD) Early Works – Access Road and Bulk Earthworks

    ACCIONA Ferrovial Joint Venture (PACIFICO) has been engaged by Health Infrastructure for bulk earthworks and to design and construct an access road to the new hospital at North Macksville.

    Bridge over Clarence River at Harwood

    Harwood, NSW (Australia)

    ACCIONA Infrastructure as part of Acciona Ferrovial Joint Venture (AFJV), has been engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.

    Move up