    Pacific Highway – Oxley Highway to Kundabung

    This 23km upgrade of the Pacific Highway to a four-lane divided highway extends from approximately 700m north of the Oxley Highway/Pacific Highway Interchange (i.e. the turnoff to Port Macquarie) to Barrys Creek at Kundabung (midway between Port Macquarie and Kempsey). The project has eight transverse and mainline bridge structures including a roundabout interchange and a main carriageway crossing of the North Coast Railway, together with a range of flora/fauna measures including fauna underpasses. Our scope included the replacement of deep culverts under the existing highway, requiring extensive traffic staging.

    A key feature was the large number of bridge structures, which included major crossings over the Hastings River and Wilson River with lengths of 571m and 523m respectively. Both of these river crossings are single bridges, each being 10 Super-T beams wide. The 14-span Wilson River Bridge is approximately 23m wide, has a clearance of approximately 8m and is founded on a mix of bored and driven tubular piles to suit the geological profile. It was constructed from a temporary rock platform, using a side-lifter truss for the majority of the 140 Super-T beams. On the wider, 15-span crossing of the deeper Hastings River the methodology for erection of the 150 Super-Ts was by using the lifting truss and large barges.

    Around half of the project was a duplication of the existing Pacific Highway, while the balance is on a new alignment traversing floodplain, soft soils, SEPP14 wetlands and sensitive environmental areas. There is approximately 6km of embankment on floodplain terrain (including 4.8km on soft soils) and the upgrade has a 1-in-100-year flood immunity. Significant flood relief structures were required on the Hastings and Wilson River floodplains, with the lengths of the six floodplain bridges being 262m, 239m, 193m, 149m, 136m and 88m.

    Paving on the project was a mixture of Plain Concrete Pavement together with Continually Reinforced Concrete Pavement topped with Stone Mastic Asphalt in some areas to reduce noise.On 17th November 2017 our team opened an 18km section of dual carriageway between the Oxley Highway Interchange and Haydons Wharf Road to traffic, five months early. Overall completion was achieved in July 2018.

    General information

    Location: Pacific Highway, Oxley to Kundabung, NSW

    Contract Type: Design and Construction

    Completion date: March 2014 - July 2018 

    Project Value: $612 million 

    key Features

    • Overall Length: 23km
    • Hastings River Bridge: 571.58m
    • Wilson River Bridge: 523.72m
    • Floodplain Bridges: 1,067m
    • Earthworks: 1,800,000m3
    • Drill & Blast: 450,000m3
    • SMZ & Verge: 350,000m3
    • Soft Soils: 4.8km

    Image Gallery

    discover other flagship projects

    Toowoomba Second Range Crossing

    Toowoomba, QLD (Australia)

    ACCIONA, as a Design and Construct JV partner of the Nexus Infrastructure consortium, ACCIONA was awarded the contract to design and construct the $1.6 billion Toowoomba Second Range Crossing (TSRC). 

    Bridge over Clarence River at Harwood

    Harwood, NSW (Australia)

    ACCIONA as part of Acciona Ferrovial Joint Venture (AFJV), was engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.

    Move up

    YOU'RE JUST ONE STEP AWAY!

    Please, confirm your subscription on the email we have sent you and your registration will be completed.

    YOU'VE ONLY GOT ONE STEP LEFT!

    Please confirm your subscription in the email we just sent you to complete the registration and you will be able to download your ebook.

    YOU ARE ALREADY SUBSCRIBED TO THE NEWSLETTER!

    If you've missed our content, try checking your junk mailbox and
    add us to your address book so you can enjoy them without any problem.

    An error has occurred.

    Your email has been unsubscribed. You will not receive more newsletters, unless you subscribe again. Thank you very much