This website uses proprietary and third-party cookies. By continuing to navigate this website, you are accepting the use that we make of them. If you wish, you may change your settings on your browser.

What are you searching?

    Highway Across Roskilde Fjord in Denmark

    Design and construction of an 8km dual-lane highway, including a 1.3km bridge that is 19.7 m wide and 1km of local road between the highway and Lyngerupvej. The new link highway will relieve traffic congestion in the town of Frederikssund, offering an alternative to the only bridge that crosses the fjord at present.

    The Frederikssund Link over Roskilde Fjord is ACCIONA Construction’s first contract in Denmark. 

    GENERAL INFORMATION

    Location: Roskilde Fjord, Denmark

    Contract type: Design and construction

    Infrastructure: Design and construction of 8km dual-lane highway including a 1.3km-long, 19.7m-wide bridge

    Value: 133 million euros

    Year of completion: 2020

    discover other flagship projects

    Macksville Hospital Development (MHD) Early Works – Access Road and Bulk Earthworks

    ACCIONA Ferrovial Joint Venture (PACIFICO) has been engaged by Health Infrastructure for bulk earthworks and to design and construct an access road to the new hospital at North Macksville.

    Bridge over Clarence River at Harwood

    Harwood, NSW (Australia)

    ACCIONA Infrastructure as part of Acciona Ferrovial Joint Venture (AFJV), has been engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.

    Move up