This website uses proprietary and third-party cookies. By continuing to navigate this website, you are accepting the use that we make of them. If you wish, you may change your settings on your browser.

What are you searching?

    BR-393/RJ Highway

    The project included the redesign of the existing highway; three toll plazas, the construction of toll booth operation office buildings and the installation of traffic control systems along the length of the highway. 

     

    General Information

    Location
    Rio de Janeiro, Brazil
    Contract type
    Design, construction, financing and operation
    Infrastructure
    construction of 200 kilometres of highway, three toll plazas, construction of an office building and installation of traffic control systems along the length of the highway
    Year of project completion
    2014

    Image Gallery

    discover other flagship projects

    Macksville Hospital Development (MHD) Early Works – Access Road and Bulk Earthworks

    ACCIONA Ferrovial Joint Venture (PACIFICO) has been engaged by Health Infrastructure for bulk earthworks and to design and construct an access road to the new hospital at North Macksville.

    Bridge over Clarence River at Harwood

    Harwood, NSW (Australia)

    ACCIONA Infrastructure as part of Acciona Ferrovial Joint Venture (AFJV), has been engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.

    Move up