    Gijón Metro Train

    Nine ventilation shafts and emergency exits were designed, and the railway tunnel was excavated with boring machines. Cladding was done with precast concrete voussoirs. The stations were built with reinforced concrete cut-off walls. 

    The new infrastructure consists of the excavation of a double-track tunnel by means of an earth pressure shield with a free diameter of 9.60 m, and 0.32 cm precast voussoirs. A 60 kg/m track with a width of 1,668 mm and a distance between axes of 3.82 m embedded in an elastomeric matrix is mounted on a concrete slab. On the sides of the track, there are several longitudinal 1-m paths under which the pipelines run.

    The project included the construction of 8 ventilation shafts along the length of the tunnel, plus emergency exits, 2 of which will also house pumping wells and one ventilation shaft. The project includes the construction of 3 stations along the line, each with 165-m long platforms. Begoña Station will be built using mining methods, whereas the stations of El Bibio and Viesques will be built using a cut-and-cover method.

    The electrification and the signalling and communications installations were not included in the project. The project also did not cover any tunnel ventilation or lighting components, cladding, finishing, or building installation.

    General Information

    Location
    Gijón, Spain
    Contract type
    Construction
    Infrastructure
    3.91-km long tunnel with a diameter of 10.60 m. 3 new stations
    Year of project completion
    2006

    Image Gallery

    discover other flagship projects

    Sydney Light Rail

    Sydney, NSW (Australia)

    ACCIONA is the Principal Design and Construct JV partner of the ALTRAC consortium, awarded with the contract to design and construct the 1.6 billion Sydney CBD South East Light Rail line.

    Ballarat Line Upgrade

    Ballarat, Victoria, Australia

    Coleman Rail (an ACCIONA company) is the Principal Design and Construct JV partner of the LCS consortium awarded with the $518 million Ballarat Line Upgrade.

    Move up

    YOU'RE JUST ONE STEP AWAY!

    Please, confirm your subscription on the email we have sent you and your registration will be completed.

    YOU'VE ONLY GOT ONE STEP LEFT!

    Please confirm your subscription in the email we just sent you to complete the registration and you will be able to download your ebook.

    YOU ARE ALREADY SUBSCRIBED TO THE NEWSLETTER!

    If you've missed our content, try checking your junk mailbox and
    add us to your address book so you can enjoy them without any problem.

    An error has occurred.

    Your email has been unsubscribed. You will not receive more newsletters, unless you subscribe again. Thank you very much