    Kwinana Waste to Energy Plant

    The Kwinana Waste to Energy facility will be the first of its kind in Australia, integrating the recovery and reuse of waste with the generation of energy to provide a practical solution to two community challenges: waste disposal and renewable energy supply.

    The facility will contribute to landfill reduction by processing 400,000 tonnes of waste every year, equivalent to one quarter of Perth’s post-recycling rubbish. This processing will reduce carbon dioxide emissions by more than 400,000 tonnes annually.

    The facility will also generate and export 36MW of green electricity to the local grid every year, sufficient to power more than 50,000 households.

     

    General information

    Location: Kwinana Industrial Area 40km south of Perth, WA

    Contract Type: ACCIONA will engineer, procure and construct the facility, with the 36-month construction period commencing in October.

    Completion date: Operations and maintenance of the facility will commence by the end of 2021.

    Operation and Maintenance: Veolia will operate and maintain the facility under a 25-year agreement.

    Project Value: $698 million

    Key Features

    • New large-scale method of managing the elimination of domestic waste over the long term by converting the waste that would otherwise go to landfill into reusable energy
    • The plant will significantly reduce carbon dioxide emissions from the waste and improve the stability of the electrical grid
    • The project incorporates “state of the art” incineration technologies from Keppel Seghers from Belgium
    • The facility will be able to process 400,000 tonnes of household, commercial and industrial residual waste per year

    Benefits

    •         More than 800 jobs created during construction
    •         More than 60 full-time positions once the facility is operational
    •         Avoids harmful methane emissions
    •         Reducing overall greenhouse gas emissions

    Image Gallery

    discover other flagship projects

    Origin Halladale Black Watch Speculant Development Project

    Port Campbell (Victoria, Australia)

    John Beever Australia (an ACCIONA Company) was engaged by ThyssenKrupp on behalf of Origin Energy for the Halladale Black WatchSpeculant Development.

     

    Steel Cement Slag Grinding Mill

    Yarraville (Victoria, Australia)

    John Beever Australia (an ACCIONA Company) was engaged for the construction of a new plant for Steel Cement in Yarraville (Victoria, Australia).

    Move up

    YOU'RE JUST ONE STEP AWAY!

    Please, confirm your subscription on the email we have sent you and your registration will be completed.

    YOU'VE ONLY GOT ONE STEP LEFT!

    Please confirm your subscription in the email we just sent you to complete the registration and you will be able to download your ebook.

    YOU ARE ALREADY SUBSCRIBED TO THE NEWSLETTER!

    If you've missed our content, try checking your junk mailbox and
    add us to your address book so you can enjoy them without any problem.

    An error has occurred.

    Your email has been unsubscribed. You will not receive more newsletters, unless you subscribe again. Thank you very much