This website uses proprietary and third-party cookies. By continuing to navigate this website, you are accepting the use that we make of them. If you wish, you may change your settings on your browser.

What are you searching?

ACCIONA successfully installs major U-Girder for Australia’s Pacific Highway

14/04/2016

ACCIONA, as part of the Pacifico Joint Venture, is delivering the upgrade of a 19.5km section of the Pacific Highway -Australia’s busiest route - between Warrell Creek and Nambucca Heads, in New South Wales.

In early March, in a highly complex operation that required maximum safety, speed and pin-point accuracy, ACCIONA successfully installed the first 40m concrete U-Girder on the new Nambucca River Bridge at Macksville “under traffic control stoppages no greater than five minutes”, according to Sebastian Bogaczyk, ACCIONA’s Structures Manager. “The U-Girder was erected with a 600T Crawler Cane, with a specially designed lattice lifting frame and high precision synchronised hoist system to ensure optimum accuracy and safety in the positioning of the girders on the elastomeric bearings”.

The U-Girders, designed specifically for this project, incorporate the highest quality and safety design specifications. “The U-Girders are a new design for the Australian market and after a long a thorough design development, ensuring full compliance with all Australian Standards, were constructed in a purpose built Precast Facility on site”.

Move up