    San Rafael Hydroelectric Plant

    ACCIONA Industrial is building a hydroelectric plant at the site of the existing San Rafael dam, on the River Santiago, in the State of Nayarit in Mexico.

    The EPC contract includes the engineering, construction, supply of equipment, assembly and start-up of the hydroelectric plant and the associated substation and high-voltage line for their connection to the electrical grid.

    The engine room is equipped with 3 turbine-generator sets that process a total of 191.25 m3/s, generating a total power of 24.3 MW in the plant. The civil works have included highly complex excavations carried out next to the existing dam.

    General Information

    Location
    San Rafael, Nayarit (Mexico)
    Contract type
    Engineering, supply, construction and start-up
    Year of project completion
    2017

    Image Gallery

    discover other flagship projects

    CT-TG Baja California II Phase 1

    Baja California (Mexico)

    This plant will cover peak and emergency demands in Baja California, and is the first of this kind of technology in the state.

    CCI Baja California Sur III

    La Paz, Baja California Sur (Mexico)

    ACCIONA Industrial carried out the design, supply, construction and start-up of a 42-MW power generation plant.

    Move up