    CT-TG Baja California II Phase 1

    The aeroderivative turbines supplied start up and reach maximum power in less than 10 minutes, making it possible to respond to peak and emergency demands.

    ACCIONA Industrial carried out the design, supply, construction and start-up of a 135-MW power generation plant, consisting of 3 General Electric natural gas turbo generators, and including a substation line and bay of 115 kV with auxiliary connections, completed over a period of 19 months.

    Model LM6000 aeroderivative turbines were designed for the aeronautical industry; here they are being applied to the electric power sector.

    General Information

    Location
    Baja California (Mexico)
    Contract type
    Design, supply, construction and start-up
    Year of project completion
    2014

    Image Gallery

    discover other flagship projects

    CCI Baja California Sur III

    La Paz, Baja California Sur (Mexico)

    ACCIONA Industrial carried out the design, supply, construction and start-up of a 42-MW power generation plant.

    CCI Baja California Sur V

    La Paz, Baja California Sur (Mexico)

    This contract recognizes the experience and track record of the company as a supplier of cutting-edge energy infrastructure in the country.