    CCI Baja California Sur III

    ACCIONA Industrial carried out the design, supply, construction and start-up of a 42-MW power generation plant.

    ACCIONA Industrial carried out the design, supply, construction and start-up of a 42-MW power generation plant, consisting of an internal combustion engine-generator fired by fuel oil, including a 230-kV substation and auxiliary connections, completed over a period of 27 months. 

    The plant includes a steam turbine that completes the thermal cycle by making use of hot exhaust gases to generate additional clean energy. More than 300 km of electrical cables have been installed, and 50,000 diametric inches of piping have been installed in different systems.

    General Information

    Location
    La Paz, Baja California Sur (Mexico)
    Contract type
    Design, supply, construction and start-up
    Year of project completion
    2014

    Image Gallery

    discover other flagship projects

    CT-TG Baja California II Phase 1

    Baja California (Mexico)

    This plant will cover peak and emergency demands in Baja California, and is the first of this kind of technology in the state.

    CCI Baja California Sur V

    La Paz, Baja California Sur (Mexico)

    This contract recognizes the experience and track record of the company as a supplier of cutting-edge energy infrastructure in the country.