    Carboneras Thermal Power Plant

    Equipped with 48 coal burners (24 in each boiler), with a total output of 1,168 MW.

    General Information

    Location
    Almería (Spain)
    Contract type
    Construction
    Year of project completion
    -------

    Image Gallery

    discover other flagship projects

    CT-TG Baja California II Phase 1

    Baja California (Mexico)

    This plant will cover peak and emergency demands in Baja California, and is the first of this kind of technology in the state.

    CCI Baja California Sur III

    La Paz, Baja California Sur (Mexico)

    ACCIONA Industrial carried out the design, supply, construction and start-up of a 42-MW power generation plant.