    Eurus Wind Farm

    The Eurus wind farm is located in La Venta, in the municipality of Juchitán de Zaragoza, in the State of Oaxaca.  It produces an average of 989 GWh of clean electricity per year, preventing the emission of 600,000 tons of CO2.  

    Eurus was built and is operated onsite by ACCIONA Energía México as a self-supply project for CEMEX, with a production capacity large enough to cover 25% of the energy needs of the Mexican company's cement plants.

    In addition to the renewable and clean nature of the energy generated, the added value of Eurus from a social and environmental point of view lies in its positive interaction with its surroundings. In 2015 the project won the BID Infraestructura 360° award for the Impact on Population and Leadership category, which recognizes the noteworthy sustainability practices in infrastructure investments in Latin America and the Caribbean.

    General Information

    Location
    La Venta, Juchitán, Oaxaca (Mexico)
    Total power
    250.5 MW
    Start-up
    2009

    Wind turbine

    Model
    ACCIONA Windpower AW 70/1500
    Rotor diameter
    70 m
    Wind class
    IEC Ia

    Highlights

    • Installation of 167 wind turbines.
    • This avoids the annual emission of 600,000 tons of CO2.
    • Covers 25% of the energy needs of Cemex cement plants.
    • 18.5-km, 230-kV transmission line.

    Image Gallery

    discover other flagship projects

    Mt Gellibrand Wind Farm

    Winchelsea, Victoria (Australia)

    Most of the land around Mount Gellibrand is privately owned and used for sheep farming. The plains are generally very flat, with a number of permanent lakes and wetlands, and also windy, making them an ideal site for a wind farm.

    Cathedral Rocks Wind Farm

    Port Lincoln, South Australia (Australia)

    The site covers an area of about 29km², with a coastal exposure of nearly 11 kilometres. The Wind Farm consists of 33 two-megawatt wind turbines – generating enough green electricity to supply 35,000 homes every year.

    Move up