    Wroclaw Bridge

     

    The project involved the construction of a 612 metre cable-stayed bridge over the main channel of the river, with an addition of two overpasses, measuring approximately 611 metres and 521 metres on each side of the river, making a total length of 1.75 kilometres. 

    The central pier, located on Rędzińska Island in the middle of the river, is 122 m tall, the highest structure of its kind in Poland. The bridge was the first in Poland to be fitted with sensors to detect damage or deterioration in any of its components. 

    General Information

    Location
    Poland
    Contract type
    Construction
    Infrastructure
    A8 bypass highway part II
    Year of project completion
    2011

    Image Gallery

    discover other flagship projects

    Bridge over Clarence River at Harwood

    Harwood, NSW (Australia)

    ACCIONA Infrastructure as part of Acciona Ferrovial Joint Venture (AFJV), has been engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.

    Toowoomba Second Range Crossing

    Toowoomba, QLD (Australia)

    ACCIONA Infrastructure as a Design and Construct JV partner of the Nexus Infrastructure consortium, awarded with the contract to design and construct the $1.6 billion Toowoomba Second Range Crossing (TSRC). 

    Move up