This website uses proprietary and third-party cookies. By continuing to navigate this website, you are accepting the use that we make of them. If you wish, you may change your settings on your browser.

What are you searching?

    Toluca Airport Boulevard Intersection

    The intersection eases traffic flow between Airport Boulevard and the Toluca-Naucalpan Federal Highway, a key area in the Toluca's metropolitan area.

    Works on the first phase started in April 2014, and it was turned over in December of the same year. The project, with a length of 3,500 metres, facilitates traffic flow in the area with a view to reducing travel time and costs.

    The project included construction of dirt roads, drainage works, foundations and structures (vehicle bridge, mechanically stabilized walls), asphalt course, horizontal and vertical signage, as well as other ancillary works.

    General Information

    Location
    Toluca, State of Mexico (Mexico)
    Contract type
    Construction
    Infrastructure
    58 supports, 357 foundation piles, 45 foundation footings, 196 columns, 68 caps and 443 prefabricated beams; the accesses and declines of the axes will be constructed by means of mechanically stabilized walls
    Year of project completion
    2014

    Image Gallery

    discover other flagship projects

    Bridge over Clarence River at Harwood

    Harwood, NSW (Australia)

    ACCIONA Infrastructure as part of Acciona Ferrovial Joint Venture (AFJV), has been engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.

    Toowoomba Second Range Crossing

    Toowoomba, QLD (Australia)

    ACCIONA Infrastructure as a Design and Construct JV partner of the Nexus Infrastructure consortium, awarded with the contract to design and construct the $1.6 billion Toowoomba Second Range Crossing (TSRC). 

    Move up