This website uses proprietary and third-party cookies. By continuing to navigate this website, you are accepting the use that we make of them. If you wish, you may change your settings on your browser.

What are you searching?

    Southeast Stoney Trail

    Completed in November 2013, the Southeast Stoney Trail project consists of 27 new bridge structures and a new highway of approximately 25 km divided into 6 lanes.

    The operation and maintenance for the project includes: maintenance and rehabilitation of the road surface, maintenance and rehabilitation of bridges, snow and ice removal, signposting, landscape and drainage maintenance, as well as lighting and traffic signal control. In addition, ACCIONA will provide the operation and maintenance of 12 km of Deerfoot Trail between Southeast Stoney Trail (currently Highway 22X) and the Highway 2A junction.

    General Information

    Location
    Calgary, Alberta, Canada
    Contract type
    Design, construction, financing, operation and maintenance (PPP)
    Infrastructure
    25 kilometres of a 6-lane road, 3 km of pedestrian paths, 27 new bridge structures, including bridges over railway lines
    Year of project completion
    2013

    Image Gallery

    discover other flagship projects

    Bridge over Clarence River at Harwood

    Harwood, NSW (Australia)

    ACCIONA Infrastructure as part of Acciona Ferrovial Joint Venture (AFJV), has been engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.

    Toowoomba Second Range Crossing

    Toowoomba, QLD (Australia)

    ACCIONA Infrastructure as a Design and Construct JV partner of the Nexus Infrastructure consortium, awarded with the contract to design and construct the $1.6 billion Toowoomba Second Range Crossing (TSRC). 

    Move up