This website uses proprietary and third-party cookies. By continuing to navigate this website, you are accepting the use that we make of them. If you wish, you may change your settings on your browser.

What are you searching?

    Siekierkowski Bridge

    ACCIONA has been operating for a decade in the construction and real estate sectors in Poland, through Mostostal Warszawa and ACCIONA Nieruchomosc. Poland is one of the key markets in ACCIONA's globalization strategy. The company has set itself the target that 70% of its business revenue come from international markets, compared to the current 20%.

    Over the years, ACCIONA, together with Mostostal, has executed many major products, such as the Wroclaw Academy of Medicine; the Siekierkowski Bridge over the River Vistula in Warsaw, which was awarded a prize by the Polish Ministry of Infrastructure in the category of Architecture and Construction; the Wolin Ring Road; the Gdansk-Kiezmark end section of National Highway Number 7 (Gdansk-Warsaw-Chyzne) and the Kiezmark Bridge; the St. Roch Bridge on the River Warta in Poznań; the facade of the Metropolitan Office Building in the centre of Warsaw (designed by Norman Foster); the facade of the new headquarters of Polish Television; and the upgrade of the railway border crossing at Terespol.

    The bridge over the River Odra will form part of the Wrocław Ring Road, in western Poland, which will link the A-4 Highway, the future S-5 Highway to Poznań and the S-8 HIghway to Warsaw. The infrastructure will include the cable-stayed bridge, with a length of 612 metres, built above the main river course, plus two overpasses measuring approximately 611 and 521 metres long respectively, located on either side of River Odra, with a total length of 1.75 kilometres.

    The central pier, located on Rędzińska Island in the middle of the river, will be 122 metres tall, the highest structure of its kind in Poland. In addition, this infrastructure will be the first in Poland to be equipped with sensors to detect damage or deterioration in any of its components.

    General Information

    Location
    Warsaw, Poland
    Contract type
    Construction
    Infrastructure
    Suspension bridge 500 metres long and 33.4 m wide, and a bike lane
    Year of project completion
    2002

    Image Gallery

    discover other flagship projects

    Bridge over Clarence River at Harwood

    Harwood, NSW (Australia)

    ACCIONA Infrastructure as part of Acciona Ferrovial Joint Venture (AFJV), has been engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.

    Toowoomba Second Range Crossing

    Toowoomba, QLD (Australia)

    ACCIONA Infrastructure as a Design and Construct JV partner of the Nexus Infrastructure consortium, awarded with the contract to design and construct the $1.6 billion Toowoomba Second Range Crossing (TSRC). 

    Move up