This website uses proprietary and third-party cookies. By continuing to navigate this website, you are accepting the use that we make of them. If you wish, you may change your settings on your browser.

What are you searching?

    Pumicestone Road Interchange Upgrade

    This fully-Federally funded project is part of the Department of Transport and Main Roads Queensland targeted improvements were made to the Bruce Highway between Caboolture and Caloundra.

    Prior to construction, the Interchange was already used by more than 50,000 vehicles a day. The clearance beneath the existing overpass was a low 4.5 metres which forced heavy road vehicles to detour from the Bruce Highway.

    The project built a new, higher overpass over the Highway including pedestrian path and cyclist lane, lengthened and straightened the four on and off-ramps, improved the intersections with local roads as well as installed pedestrian and cycling facilities. The overpass construction was completed in 2015.

    General information

    Location
    Caboolture, QLD, Australia
    Our role
    Construction
    Infrastructure
    Improvements made to the Bruce Highway between Caboolture and Caloundra
    Project value
    $AU29 million
    Year of project completion
    2015

    Image Gallery

    discover other flagship projects

    Bridge over Clarence River at Harwood

    Harwood, NSW (Australia)

    ACCIONA Infrastructure as part of Acciona Ferrovial Joint Venture (AFJV), has been engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.

    Toowoomba Second Range Crossing

    Toowoomba, QLD (Australia)

    ACCIONA Infrastructure as a Design and Construct JV partner of the Nexus Infrastructure consortium, awarded with the contract to design and construct the $1.6 billion Toowoomba Second Range Crossing (TSRC). 

    Move up