    Nose Hill Interchange

    Primary contractor responsible for the construction of the project.

    The design was provided by Alberta Transportation, although there were several specific items that needed more in-depth design (bearings, expansion joints, MSE walls, steel diaphragms, etc.). Therefore, our construction team also took care of this part of the design, together with our suppliers and with the support of our engineering company, ACCIONA Ingeniería.

    General Information

    Location
    Calgary, Alberta, Canada
    Contract type
    Design and construction
    Infrastructure
    2.9 km north to south, and 1.6 km east to west. 2 new bridges of 165 m and 150 m respectively, as well as the widening of an existing 166-metre bridge, from 4.2 metres to 11.2 metres
    Year of project completion
    2014

    Image Gallery

    discover other flagship projects

    Bridge over Clarence River at Harwood

    Harwood, NSW (Australia)

    ACCIONA Infrastructure as part of Acciona Ferrovial Joint Venture (AFJV), has been engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.

    Toowoomba Second Range Crossing

    Toowoomba, QLD (Australia)

    ACCIONA Infrastructure as a Design and Construct JV partner of the Nexus Infrastructure consortium, awarded with the contract to design and construct the $1.6 billion Toowoomba Second Range Crossing (TSRC). 

    Move up