This website uses proprietary and third-party cookies. By continuing to navigate this website, you are accepting the use that we make of them. If you wish, you may change your settings on your browser.

What are you searching?

    Izbor Viaduct

    The route passes through geotechnically complex terrain, where there are many active landslides which have made it necessary to carry out a whole range of geotechnical stabilization measures; it also has a very rugged topography, making it necessary to build six viaducts of different kinds, adapted in each case to the features of the terrain.

    The Ízbor-Vélez de Benaudalla section of the Sierra Nevada Highway (A-44) runs through the province of Granada. This is a newly laid highway section measuring 10 km long, with six viaducts of different types, which together make up a total of 2,700 m in length and 5 million m3 of excavation.

    General Information

    Location
    Granada, Spain
    Contract type
    Construction
    Infrastructure
    950 m long, 140-m spans and piers up to 70 m tall
    Year of project completion
    2008

    Image Gallery

    discover other flagship projects

    Bridge over Clarence River at Harwood

    Harwood, NSW (Australia)

    ACCIONA Infrastructure as part of Acciona Ferrovial Joint Venture (AFJV), has been engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.

    Toowoomba Second Range Crossing

    Toowoomba, QLD (Australia)

    ACCIONA Infrastructure as a Design and Construct JV partner of the Nexus Infrastructure consortium, awarded with the contract to design and construct the $1.6 billion Toowoomba Second Range Crossing (TSRC). 

    Move up