This website uses proprietary and third-party cookies. By continuing to navigate this website, you are accepting the use that we make of them. If you wish, you may change your settings on your browser.

What are you searching?

    Highway: Frigiliana-Nerja

    This project is a section of highway 4,080 m long in both directions, between Frigiliana and Maro. It is a cross-section formed by two separate carriageways, with two lanes of 3.50 m each, 2.5 m outside shoulder and 1 m inside shoulder, and 1 m berms.

    The project includes two tunnels, one per carriageway, with a length of 1,030 m on the left and 920 m on the right. These tunnels cross schistose soils during the first few metres of the Málaga side, and the remainder is marble. Several geological faults are crossed, some of them of regional importance (Fault of Frigiliana).

    General Information

    Location
    Málaga, Spain
    Contract type
    Construction
    Infrastructure
    Construction of tunnels in both directions, two double viaducts and two single viaducts
    Year of project completion
    1999

    Image Gallery

    discover other flagship projects

    Bridge over Clarence River at Harwood

    Harwood, NSW (Australia)

    ACCIONA Infrastructure as part of Acciona Ferrovial Joint Venture (AFJV), has been engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.

    Toowoomba Second Range Crossing

    Toowoomba, QLD (Australia)

    ACCIONA Infrastructure as a Design and Construct JV partner of the Nexus Infrastructure consortium, awarded with the contract to design and construct the $1.6 billion Toowoomba Second Range Crossing (TSRC). 

    Move up