This website uses proprietary and third-party cookies. By continuing to navigate this website, you are accepting the use that we make of them. If you wish, you may change your settings on your browser.

What are you searching?

    Ebro Bridge

    The foundation, made of piles and abutments, was executed by means of piles with a diameter of 1.50 metres and depths ranging from 17 to 26 metres.

    It was designed in such a way that it allows for future expansion to three lanes, and a 0.75-m sidewalk was created next to the 2.50-m hard shoulder, allowing any drivers whose cars have broken down, or any other person, to walk safely along the road should the General Council of Aragón deem it necessary.

    General Information

    Location
    Zaragoza, Spain
    Client
    Government of Aragón (End Client). Concessionaire: Sociedad Concesionaria Puente del Ebro, S.A.
    Contract type
    Design, construction, operation and maintenance(PPP)
    Infrastructure
    Structure for crossing over the River Ebro: The viaduct crossing over the River Ebro has a total length of 400 m, and has two parallel viaducts made up of 10 spans of 40 m each, executed with decks for each carriageway on prefabricated double T-beams and a compression slab, with a maximum height of 15 m
    Year of project completion
    2008

     

    Image Gallery

    discover other flagship projects

    Bridge over Clarence River at Harwood

    Harwood, NSW (Australia)

    ACCIONA Infrastructure as part of Acciona Ferrovial Joint Venture (AFJV), has been engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.

    Toowoomba Second Range Crossing

    Toowoomba, QLD (Australia)

    ACCIONA Infrastructure as a Design and Construct JV partner of the Nexus Infrastructure consortium, awarded with the contract to design and construct the $1.6 billion Toowoomba Second Range Crossing (TSRC). 

    Move up