    Champotón Bridges

    The construction for the Government of the State of Campeche started in July 2009 and lasted 19 months.

    The construction has a total length of 837 m. The bridges make up a total of four structures, with lengths of 195 m, 111 m, 167 m and 364 m, respectively.

    General Information

    Location
    Campeche (Mexico)
    Contract type
    Construction
    Infrastructure
    construction of four bridges. The lengths are, respectively, 195 m, 111 m, 167 m and 364 m.
    Year of project completion
    2011

    Image Gallery

    discover other flagship projects

    Macksville Hospital Development (MHD) Early Works – Access Road and Bulk Earthworks

    ACCIONA Ferrovial Joint Venture (PACIFICO) has been engaged by Health Infrastructure for bulk earthworks and to design and construct an access road to the new hospital at North Macksville.

    Bridge over Clarence River at Harwood

    Harwood, NSW (Australia)

    ACCIONA Infrastructure as part of Acciona Ferrovial Joint Venture (AFJV), has been engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.

    Move up