This website uses proprietary and third-party cookies. By continuing to navigate this website, you are accepting the use that we make of them. If you wish, you may change your settings on your browser.

What are you searching?

    Centenario Bridge

     

    With two towers, each 120 metres tall, the Centenario Bridge has a deck with the maximum height of 45 metres, above the Guadalquivir River to allow ships the passage of ships. the Centenario Bridge was inaugurated in August 2004. 

    General Information

    Location
    Seville, Spain
    Contract type
    Construction
    Infrastructure
    265 metres long, with two piers, each of which are 120 metres tall
    Year of project completion
    2004

    Image Gallery

    discover other flagship projects

    Bridge over Clarence River at Harwood

    Harwood, NSW (Australia)

    ACCIONA Infrastructure as part of Acciona Ferrovial Joint Venture (AFJV), has been engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.

    Toowoomba Second Range Crossing

    Toowoomba, QLD (Australia)

    ACCIONA Infrastructure as a Design and Construct JV partner of the Nexus Infrastructure consortium, awarded with the contract to design and construct the $1.6 billion Toowoomba Second Range Crossing (TSRC). 

    Move up