This website uses proprietary and third-party cookies. By continuing to navigate this website, you are accepting the use that we make of them. If you wish, you may change your settings on your browser.

What are you searching?

    A-63 Divided Highway: Grado-Doriga

    The length of the section is 4.217 km. Some unique features worthy of mention are the El Fresno tunnels, 949 m in length on the right-hand lane and 923 m in length on the left-hand lane. The section includes the Dóriga junction.

    General Information

    Location
    Grado-Dóriga, Asturias, Spain
    Contract type
    Construction
    Infrastructure
    10 structures; 1 viaduct, 3 overpasses, 6 underpasses, as well as 2 tunnels, totalling 1,892 m in length
    Year of project completion
    2004

    Image Gallery

    discover other flagship projects

    Bridge over Clarence River at Harwood

    Harwood, NSW (Australia)

    ACCIONA Infrastructure as part of Acciona Ferrovial Joint Venture (AFJV), has been engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.

    Toowoomba Second Range Crossing

    Toowoomba, QLD (Australia)

    ACCIONA Infrastructure as a Design and Construct JV partner of the Nexus Infrastructure consortium, awarded with the contract to design and construct the $1.6 billion Toowoomba Second Range Crossing (TSRC). 

    Move up