This website uses proprietary and third-party cookies. By continuing to navigate this website, you are accepting the use that we make of them. If you wish, you may change your settings on your browser.

What are you searching?

    Medellín Metro

    The main feature of this project was the construction of two lines with a total length of 32 km and 25 stations, such that 40% of the developed area or the area suitable for development to be located at a distance of less than one kilometre from any of the system's stations.

    Line A runs through the city, from Niquia to Itagüi, with a distance of 23.22 km, of which 16.72 km are at grade and 6.50 km are built as a viaduct. The project was completed in March 1997.

    General Information

    Location
    Medellín, Colombia
    Contract type
    Design and construction
    Infrastructure
    86 km long, 75 km at grade and 11 km elevated
    Year of project completion
    1997

    Image Gallery

    discover other flagship projects

    Legacy Way Tunnel

    Brisbane, QLD (Australia)

    ACCIONA Infrastructure is the lead partner of the Transcity Joint Venture, for the design, construction, operation and 10 year maintenance of the $1.5 billion Legacy Way project, in Brisbane, Queensland.

    Sydney Light Rail

    Sydney, NSW (Australia)

    ACCIONA Infrastructure is the Principal Design and Construct JV partner of the ALTRAC consortium, awarded with the contract to design and construct the $2.1 billion Sydney CBD South East Light Rail. 

    Move up