    Madrid-Galicia High-Speed Rail

    ACCIONA participated in the construction of all three sections of the project. From Olmedo to Zamora, there are 32 km of dual track, 7 viaducts, 10 overpasses and 12 underpasses. From Vigo to Das Maceiras, there are 7 km of dual track and two 10.9-km long twin tunnels. From Zamora to Lubian, there are 42 km of dual track, 2 tunnels (1.7 km and 2.4 km) and 2 bridges. These project sections were completed in 2009, 2010 and 2012, respectively.

    It is a new 435-km long route, installed with UIC-gauge double electrified track (1.4 mm) and ASFA and ERTMS signalling.

    General Information

    Location
    Madrid-Galicia, Spain
    Contract type
    Conventional acquisition
    Infrastructure
    435-km long route, installed with UIC-gauge double electrified track (1.4 mm) and ASFA and ERTMS signalling
    Year of project completion
    2012

    Image Gallery

    discover other flagship projects

    Legacy Way Tunnel

    Brisbane, QLD (Australia)

    ACCIONA Infrastructure is the lead partner of the Transcity Joint Venture, for the design, construction, operation and 10 year maintenance of the $1.5 billion Legacy Way project, in Brisbane, Queensland.

    Sydney Light Rail

    Sydney, NSW (Australia)

    ACCIONA Infrastructure is the Principal Design and Construct JV partner of the ALTRAC consortium, awarded with the contract to design and construct the $2.1 billion Sydney CBD South East Light Rail. 

    Move up