    Ma On Shan Line

    The 11.4 km railway involved the construction of 9.2 km twin deck viaducts, eight stations and a 2.2 km section at ground level. All stations are pile-supported elevated structures. The construction included foundations, reinforced concrete works, structural and architectural sidewalks, footbridges, links to the existing subway, new subways, elevated walkway systems, E&M signalling installation and architectural finishing works.  

    The majority of the viaduct spans were constructed using precast segmental methods and a further five special spans were constructed using free balanced cantilever methods.

    General Information

    Location
    Hong Kong
    Contract type
    Construction
    Infrastructure
    Foundations, reinforced concrete works, structural and architectural sidewalks, footbridges, links to the existing subway, new subways, elevated walkway systems, installation of E&M signalling
    Year of project completion
    2004

    Image Gallery

    discover other flagship projects

    Legacy Way Tunnel

    Brisbane, QLD (Australia)

    ACCIONA Infrastructure is the lead partner of the Transcity Joint Venture, for the design, construction, operation and 10 year maintenance of the $1.5 billion Legacy Way project, in Brisbane, Queensland.

    Sydney Light Rail

    Sydney, NSW (Australia)

    ACCIONA Infrastructure is the Principal Design and Construct JV partner of the ALTRAC consortium, awarded with the contract to design and construct the $2.1 billion Sydney CBD South East Light Rail. 

    Move up