    The project can be divided into two large parts: Pumping and load breaking, and land outfall. 

    The pumping system consists of a 102-m trench containing two 1,200-mm cast-iron pipes that convey the water to the inlet of the land outfall. At this point, a large load breaking inspection chamber is installed, such that from this point, the water flows by gravity through the outfall, which has a length of 7,344 m and an internal diameter of 3 m. The tunnel excavation was performed with a tunnel boring machine (TBM).

    The upper part of the chamber will be developed to create a recreational area for urban use.

    General Information

    Location
    Ferrol, La Coruña, Spain
    Contract type
    Construction
    Infrastructure
    7,343-m long tunnel of 3 metres in diameter and a slope of 1.5 m x 1,000 m
    Year of project completion
    2008

    Image Gallery

    discover other flagship projects

    Legacy Way Tunnel

    Brisbane, QLD (Australia)

    ACCIONA Infrastructure is the lead partner of the Transcity Joint Venture, for the design, construction, operation and 10 year maintenance of the $1.5 billion Legacy Way project, in Brisbane, Queensland.

    Sydney Light Rail

    Sydney, NSW (Australia)

    ACCIONA Infrastructure is the Principal Design and Construct JV partner of the ALTRAC consortium, awarded with the contract to design and construct the $2.1 billion Sydney CBD South East Light Rail. 

    Move up