This website uses proprietary and third-party cookies. By continuing to navigate this website, you are accepting the use that we make of them. If you wish, you may change your settings on your browser.

What are you searching?

    Barcelona Metro Line 5: Horta-Vall d'Hebron

    The project's features include the construction of the subway station caverns using lateral galleries, pile-driving operations used on a non-circular section, the construction of the station accesses using the traditional method of ramps in sections of up to 70 m, and a number of shafts of up to 60 m deep and 16 m in diameter in an urban area.

    In addition, the interior installations and architecture were carried out simultaneously in three stations, along with their corresponding access points.  

    General Information

    Location
    Barcelona, Spain
    Contract type
    Construction
    Infrastructure
    1.4-km long tunnel and a new station, including the interior installations for three stations, as well as their corresponding access points
    Year of project completion
    2010

    Image Gallery

    discover other flagship projects

    Legacy Way Tunnel

    Brisbane, QLD (Australia)

    ACCIONA Infrastructure is the lead partner of the Transcity Joint Venture, for the design, construction, operation and 10 year maintenance of the $1.5 billion Legacy Way project, in Brisbane, Queensland.

    Sydney Light Rail

    Sydney, NSW (Australia)

    ACCIONA Infrastructure is the Principal Design and Construct JV partner of the ALTRAC consortium, awarded with the contract to design and construct the $2.1 billion Sydney CBD South East Light Rail. 

    Move up