    New Oza Dock

    This project consisted of the construction of a fishing dock formed by a 1,064 m long breakwater, in three alignments. The inside breakwater, which contains a 6 m deep and 1,083 m long caisson quay; a 167 m long external dike; 200 m of artificial beach between the outer sea wall and the "Talleres Valiña Lavandeira" franchise, with a 20 m minimum width of dry beach; and the foundations (dredging and pavement) for the future Altura and Bajura jetties, both 6 m deep and 200 m and 150 m long respectively.

    General Information

    Location
    A Coruña, Spain
    Contract type
    Construction
    Infrastructure
    1,064 m long breakwater , in three alignments; the internal alignment is made up of a 6 m deep and 1,083 m long caisson quay and a 167 m long outer sea wall, 200 m of artificial beach and the foundations for the future jetties
    Year of project completion
    1995

    Image Gallery

    discover other flagship projects

    Deep Lake Water Cooling System

    Ontario (Canada)

    The City of Toronto Deep Lake Water Cooling (DLWC) system is the world’s largest cooling solution of its kind. The system was built by ACCIONA Infrastructures to offer a sustainable, alternative source of air conditioning by using cold water from the depths of Lake Ontario to cool downtown Toronto office buildings. 

    Port of Salina Cruz

    Salina Cruz, Oaxaca (Mexico)

    Expansion of the navigation channel from a bottom depth of 80 m to 120 m, allowing access to larger vessels and the possibility of incorporating new commercial routes.

    Move up