This website uses proprietary and third-party cookies. By continuing to navigate this website, you are accepting the use that we make of them. If you wish, you may change your settings on your browser.

What are you searching?

    Roda de Bará Marina

    The new harbour, with an approximate surface area of 191,000 m2, optimizes the activities directly related to the port, and is designed to accommodate 725 boats, mainly of medium size (8 m to 20m in length), 10 of which may exceed 20 m, and 78 of under 8 m to be moored in the dry dock. 

    Roda de Barà port offers 643 moorings for boats with a length of between 8 m and 25 metres, and 132 warehouses with sizes between 7 m and 9.5 m. The concessionaire also operates a parking area with 511 spaces. The port also includes 7,000 m2 of commercial area and 5,000 m2 of green space.

    General Information

    Location
    Tarragona, Spain
    Contract type
    Design, construction, financing and operation
    Infrastructure
    With an approximate area of 191,000 m2, it optimizes the activities directly related to the port, and is designed to accommodate 725 boats
    Year of project completion
    2006

    Image Gallery

    discover other flagship projects

    Legacy Way Tunnel

    Brisbane, QLD (Australia)

    ACCIONA Infrastructure was lead partner of the Transcity Joint Venture, for the design, construction, operate and 10 year maintenance of the $1.5 billion Legacy Way project, in Brisbane, Queensland.

    Sydney Light Rail

    Sydney, NSW (Australia)

    ACCIONA Infrastructure is the Principal Design and Construct JV partner of the ALTRAC consortium, awarded with the contract to design and construct the $2.1 billion Sydney CBD South East Light Rail. 

    Move up