This website uses proprietary and third-party cookies. By continuing to navigate this website, you are accepting the use that we make of them. If you wish, you may change your settings on your browser.

What are you searching?

    Zaragoza Maternity Hospital

    The project consisted of a 2,330 m2 expansion, a foundation made of micropiles and an overall reinforcement of the structure and concrete slabs; the flooring was demolished prior to reinforcing it.

    The building was also provided with facilities typical of a new-build hospital, although since it was required to remain operational during the construction, the project had to be carried out in three phases.

    The project affected a total area of 26,330 m2. After a complete evaluation of the existing structure, a design was drafted, and then the foundation and structure were reinforced. This meant that the renovation and expansion project could not start until June of 1987; factoring in the temporary transfers that had to be performed in order to keep the services running, the project took a total of 34 months for all three phases, which works out to less than 11 months per phase.

    The contract was extended to include the adaptation of the Ruiseñores Clinic, the conversion of the current clinic on Calle Oviedo into a basic healthcare unit, stores and workshops, refurbishment of kitchens and the emergency ward, expansion of the radiology department and other projects, increasing to a total of 12 contracts.

    General Information

    Location
    Zaragoza, Spain
    Contract type
    Construction
    Infrastructure
    The total area is 26,330 m2. In addition to the areas used for outpatient services, the hospital is equipped with 350 beds (190 beds in the maternity ward and 160 in the children's ward), as well as areas for services, changing rooms and supply centres
    Year of project completion
    1990

    Image Gallery

    discover other flagship projects

    Legacy Way Tunnel

    Brisbane, QLD (Australia)

    ACCIONA Infrastructure was lead partner of the Transcity Joint Venture, for the design, construction, operate and 10 year maintenance of the $1.5 billion Legacy Way project, in Brisbane, Queensland.

    Sydney Light Rail

    Sydney, NSW (Australia)

    ACCIONA Infrastructure is the Principal Design and Construct JV partner of the ALTRAC consortium, awarded with the contract to design and construct the $2.1 billion Sydney CBD South East Light Rail. 

    Move up